ENG:
CLIENT: victor buyck steel construction belgium / bam civil netherlands
OFFICE: technisch bureau de heer / www.tbdeheer.nl
ROLE: PROJECTMANAGER/lead draftsman EMPLOYED BY technisch bureau de heer
DESCRIPTION: The bridge structure is a 70-metre high pylon, 24 steel cables and a circular bridge deck used for pedestrial and biking traffic. The cables are attached to the inner side of the bridge deck, right where the bridge deck connects to the circular counterweight.
NL:
OPDRACHTGEVER: VICTOR BUYCK STEEL CONSTRUCTION BELGIUM / bam civiel nederland
BUREAU: TECHNISCH BUREAU DE HEER / www.tbdeheer.nl
FUNCTIE: projectmanager/hoofd tekenkamer werkzaam voor technisch bureau de heer
OMSCHRIJVING: DE BRUG constructie BESTAAT UIT EEN 70 METER HOGE PYLOON, 24 TUIEN EN EEN ROND BRUGDEK VOOR VOETGANGERS EN FIETSVERKEER. DE TUIEN ZITTEN VERBONDEN AAN DE BINNENZIJDE VAN HET BRUGDEK waar een inwendige ballastring is bevestigd.